Adityawarman
According to Government Regulation No. 35/2004 related to the philosophy of facility utilization, the use of existing production facilities is possible as long as there is excess capacity. In addition, the imposition of processing costs also needs to be considered to ensure the appropriateness of the usage costs and guarantee the operation of the existing facilities so that later it will become the basis for the formulation of Collaborative Use of Facilities to facilitate the use of facilities by developing new fields. In this study there were two cases in the "X" field that were simulated in seven years (2015 to 2021). The first case is the scenario of field development by building its own facilities and the second case is the scenario of field development using facility sharing. Then, the two cases are evaluated by the Gross Split scheme, in accordance with applicable law, to calculate the economics of the project carried out both in terms of the government and the contractor.
Penerapan Karya Tulis
The development of deepwater offshore fields is known to have high costs, and in some cases it is a challenge in the economics of the project especially the development of marginal deepwater fields. One way to reduce development costs is to use production facilities that are in the development field sector and have oil and gas production processing capabilities that are still operating. By transferring part of the production processing process to an existing facility, the scope of the production facility to be built can be simplified by utilizing the capabilities of the existing facility to process production from the newly developed field.