Defita Rossa Sandriana Naseer
Group 1 of ITB Thematic KKN with the theme of waste processing brings the main program and a companion program. For the main program, group 1 construction of compost houses. The compost house was built as a place where the composting process was carried out with garbage originating from all blocks in the village of Kebonturi. The Kompos House is equipped with the management in charge of running the Kebonturi Village Composting program. This is done to support the traveling of compost so that the composting program can continue for a long time. The compost is equipped with a chopper machine and composting equipment. The next main program is Composting Masaro. The planned composting program is to help reduce the problem of organic waste processing in Kebonturi Village, where this village does not yet have an adequate waste treatment system in each block. By weighing the condition that residents' waste is dominated by the type of organic waste, so that the composting processing system is proposed. The next program is the provision of trash bins, 30 trash bins have been distributed at 15 points.